Explore the benefitsBook a FREE Trial Today
Nationwide coverage you can rely onTime saving tools - Cost saving resultsFlexible hire solutions for every projectExpert guidance and ongoing supportNationwide coverage you can rely onTime saving tools - Cost saving resultsFlexible hire solutions for every projectExpert guidance and ongoing support

Liftroller Floor – Skanska, Norway

6 months
Stavanger, Norway

Skanska

Project Client

Liftroller Floor – Skanska, Norway

Levvågskvartalet Development Project

The Levvågskvartalet project in Stavanger represents one of the most comprehensive mixed-use developments in the region, incorporating educational, community, and retail facilities.

Skanska Levvågskvartalet Office Building

Modern office building construction at the Levvågskvartalet development in Stavanger

Project Scope

This extensive development includes:

  • Educational Facilities: Modern school and nursery facilities

  • Community Spaces: Multi-purpose community centre

  • Entertainment: Multi-purpose hall for events and activities

  • Commercial Areas: Retail spaces for local businesses

Construction Progress

Advanced construction phases showing the scale of the Levvågskvartalet development

Liftroller Floor Implementation

The Liftroller Floor system was essential for:

  • Multi-Building Coordination: Efficient material flow between different structures

  • Complex Logistics: Managing materials for diverse building types

  • Timeline Management: Keeping the extensive project on schedule

  • Quality Control: Maintaining construction standards across all facilities

Building Development Overview

Comprehensive view of the mixed-use development showcasing multiple building phases

Project Implementation

Professional documentation of the Liftroller system implementation at Levvågskvartalet

Specialist Installation Team

The project benefited from expert installation and maintenance services, with dedicated specialists ensuring optimal system performance throughout the construction phases.

Ventilation Specialist Work

Ronny Brattaas, ventilation specialist, demonstrating precision installation techniques

Technical Installation

Advanced technical installation work ensuring system integration with building infrastructure

Installation Excellence

Final installation phases demonstrating the precision and quality of the installation work

Community Impact

This development represents a major boost for the entire district, providing essential services and creating a hub for community activities. The efficient use of Liftroller technology helped ensure timely delivery of these important community facilities.

What Our Customers Say

Don't just take our word for it - hear from satisfied customers who've experienced the LiftAU difference

Jack Hendy
Owner, The Pastry Room
"The Liftroller E Mover proved incredibly useful for moving boxes around our warehouse, significantly reducing physical strain and saving valuable man-hours."
Liftroller E Mover Equipment HireUK
Isak Digre
Manager, Hent Danmark A/S
"In less than an hour, we hauled more than 12 tonnes of plaster through the window."
Construction Material HandlingDenmark
Mats Sveen
Supervisor, Bunde Bygg A/S
"With Liftroller, everything was much easier, and the workers did not have to wear themselves out. Absolutely brilliant!"
Construction Material TransportNorway
Christian Hegland
Chairman, Berland Bygg A/S
"By renting a Liftroller, you will quickly recover the cost, especially considering all the sick leave avoided. It's a win-win situation."
Construction Equipment RentalNorway

Ready to Roll?

Stop dragging your materials. Get your logistics moving.

Get a Quote