Waterloo Refurbishment Trial Project
8Build conducted comprehensive trials of the Liftroller E Mover system during their Waterloo refurbishment project, evaluating its effectiveness for urban construction environments.
Trial Objectives
The trial program aimed to assess:
Urban Efficiency: Performance in dense London construction environment
Material Handling: Effectiveness for refurbishment material logistics
Workflow Integration: Compatibility with existing construction processes
ROI Assessment: Cost-benefit analysis for future projects
Liftroller E Mover Performance
The trial demonstrated:
Improved Material Flow: Significant enhancement in material transportation efficiency
Reduced Manual Labor: Decreased physical strain on construction workers
Time Savings: Accelerated project timeline through efficient handling
Quality Maintenance: Consistent material handling standards
Trial Results
The successful trial led to 8Build's continued adoption of Liftroller technology, proving the system's value in urban refurbishment projects.
Future Implementation
Based on the positive trial results, 8Build has integrated Liftroller systems into their standard project planning for similar urban refurbishment works.



